“Shear stud capacity” gets asked two ways. A designer wants to know how much longitudinal shear one stud carries. A buyer wants to know whether the manufacturer can supply the whole job on time. This page answers both.
A headed stud can fail in two ways. The stud itself can shear off at the weld collar, or the concrete around it can crush. The design resistance is whichever comes first. Eurocode 4 (EN 1994-1-1) writes the two limits like this:
Stud steel: PRd = 0.8 × fu × (πd²/4) / γV
Concrete: PRd = 0.29 × α × d² × √(fck × Ecm) / γV
d is the shank diameter, fu the ultimate tensile strength of the stud steel (not more than 500 MPa), fck and Ecm the concrete strength and modulus, and γV the partial factor, recommended as 1.25. The smaller of the two results governs.
The table below works both limits through for studs to ISO 13918 with fu = 450 MPa, the minimum tensile strength for standard shear connector stud material, in normal-weight concrete of three common grades. It assumes a solid slab and a stud at least four diameters tall after welding, so α = 1.
| Stud diameter | Steel limit | C25/30 | C30/37 | C40/50 |
|---|---|---|---|---|
| 16 mm | 57.9 | 52.3 | 57.9 | 57.9 |
| 19 mm | 81.7 | 73.7 | 81.7 | 81.7 |
| 22 mm | 109.5 | 98.9 | 109.5 | 109.5 |
| 25 mm | 141.4 | 127.6 | 141.4 | 141.4 |
Two things stand out. In C25/30 the concrete governs at every size. From C30/37 upward the stud steel governs, so a stronger concrete buys nothing more per stud — only a larger diameter does. And capacity rises with the square of the diameter: one 25 mm stud carries about as much as three 16 mm studs.
AISC 360 uses Qn = 0.5 × Asa × √(f′c × Ec), capped at Rg × Rp × Asa × Fu, with Fu = 65 ksi for headed studs. For a 3/4 in. stud welded directly to the beam in 4 ksi normal-weight concrete, the concrete expression gives about 26.1 kips, the cap (Rg = 1.0, Rp = 0.75) gives about 21.5 kips (95.8 kN), and the cap governs. That is a nominal strength; the resistance factor is applied at the composite beam level, not per stud.
Indian composite designs to IS 11384 use that code’s own design values for headed studs. Whichever code you work to, the stud has to be what the calculation assumed: the right diameter, a sound full weld collar, and material that actually meets the tensile strength used in the formula.
Yes, through three things the manufacturer controls:
150 tonnes of shear connector studs a month. In pieces that depends on the size mix. As a guide, a 19 × 100 mm stud weighs a little over a quarter of a kilogram, so 150 tonnes is in the order of 5.5 lakh (550,000) studs of that size a month.
For a bridge or a large composite frame, the question is usually not whether a job fits in a month but whether deliveries can follow the erection sequence. Send the quantities by size and the site schedule, and we will tell you how we would phase supply.
Our shear stud weight and quantity calculator gives studs per beam from the layout and total weight for the consignment. For the difference between headed shear studs and punching shear studs, see shear connector studs vs PSR studs, and for the product itself, our shear connector studs page.
Send the stud sizes, quantities and delivery schedule. We will come back with weights, ferrule quantities and a quotation.
Email your requirement Ask on WhatsAppResistance values on this page are worked examples of the published EN 1994-1-1 and AISC 360 expressions under the stated assumptions. They are for guidance and do not replace the structural designer’s calculation for a specific slab, deck and loading. S R Forgings, E-615 Phase-VII, Focal Point, Ludhiana 141010, Punjab, India.